Specification preparation
We assemble a technical specification for grant, tender or internal procurement requirements — with correct wording and a justified equipment list.
A procurement specification is its own genre with its own rules. The wording must be precise enough to get the right equipment, yet not violate competitive-procurement rules. A mistake at the document stage means either the wrong delivery or a rejected bid.
We help build the specification so it reflects the study's real needs: which parameters are critical for your paradigms and which can stay as a range, how to justify the required channel count or sampling rate, and how to describe compatibility with equipment already in the lab.
We also prepare the rationale — a document explaining to the committee or grant body why this particular set was chosen and how it maps to the stated scientific aims.
What you get
- Technical specification in a procurement-ready format
- Rationale for the equipment list
- Compatibility requirements against your existing equipment
How the work runs
Clarifying procurement requirements
Selecting the set for the task
Drafting the specification and rationale
Revising against committee feedback
FAQ
Can you help before the grant is awarded?
Yes. Knowing the real cost and composition of the equipment while the application is being written makes the proposed budget credible.